Portable Restrooms
Standard units for active jobsites, serviced on a set schedule.
Restrooms, wash stations & trailers
Keep your crew clean and your site compliant with the right mix of restrooms, hand-washing, and trailer options — delivered and serviced on schedule.
Standard units for active jobsites, serviced on a set schedule.
Wheelchair-accessible units to meet site requirements.
Higher-comfort, climate-controlled options for longer projects.
Foot-pump sinks and sanitizer stands, kept stocked.
For long-duration, remote, or restoration work.
Holding and pump-out service for sites without sewer access.
Potable and non-potable water supply for wash water and site use.
OSHA’s construction sanitation rule (29 CFR 1926.51) sets the floor: at least one toilet for up to 20 workers, then one toilet and one urinal per 40 workers as the crew grows, with more seats required on larger sites. It also requires washing facilities and an adequate supply of potable drinking water. Treat these as minimums — comfortable, well-serviced sites usually plan for more.
Beyond the OSHA minimum, a common industry guideline is one standard restroom per 10 workers for a 40-hour week on a weekly service schedule. Longer shifts, six-day weeks, heavy water intake in summer heat, or public-facing work all push that number up. When in doubt, add a unit — an overflowing restroom costs you far more in morale and lost time than an extra rental.
Toilets alone don’t meet the requirement. Crews need soap, clean water, and a way to dry — whether that’s a foot-pump wash station beside the restrooms or sinks built into a restroom trailer. Placing hand-washing next to eating areas and restrooms keeps your site cleaner and your inspection record clean.
A restroom is only as good as its last pump-out. Standard service is weekly, but high-traffic sites, restroom trailers, and summer peaks often need twice-weekly or more. We confirm a schedule that matches your crew size and usage so units stay stocked and sanitary for the life of the project.
Common configurations to help you choose. Final mix and service frequency are confirmed on your quote.
OSHA sets the minimum — roughly one toilet for up to 20 workers, scaling up from there — and a common planning rule is one unit per 10 workers on a weekly service schedule. Shift length, project duration, and summer heat all factor in. Tell us about the job and we’ll recommend the right mix.
Standard service is weekly, which includes pump-out, cleaning, and restocking paper, soap, and sanitizer. High-traffic sites and restroom trailers often move to twice-weekly or more. We set a schedule to match your crew size and usage.
Yes. OSHA requires washing facilities on site, so most jobs pair restrooms with foot-pump wash stations or a trailer with built-in sinks. We make sure soap, water, and drying are covered, not just the toilets.
Yes. Wheelchair-accessible units are available and are often required on public-facing or publicly funded work. Let us know your site’s requirements and we’ll include the right accessible units in the plan.
Cold-weather and heated options are available for winter and high-altitude work, and service schedules can be adjusted for freeze conditions. Share your location and timeline and we’ll plan around the weather.
Units are delivered and serviced by truck, so we need a clear, reachable placement spot and room for the service vehicle to get close. Tell us about site access and surface conditions and we’ll confirm placement before delivery.
Secure the perimeter and control access with panels, gates, screen, and site-safety equipment.
Roll-off dumpsters and debris removal sized to your project, with easy pickups and exchanges.
Jobsite offices, secure storage, and material handling to run and stage your project on site.
Tell SITE PRO what your project needs — sanitation, fencing, dumpsters, a site office, power. One request, one point of contact, and rough numbers are fine to start.